IMPORTANT DO/DON’TS FOR TURBINE /BOILER OPERATION - ASKPOWERPLANT
IMPORTANT DODON’TS FOR TURBINE BOILER OPERATION
BOILER OPERATION
1

IMPORTANT DO/DON’TS FOR TURBINE /BOILER OPERATION

In this article we discussed about the important points which are kept into the mind every power plant engineer which is comes into shift operation these points are responsible for smooth running of power plant and its operation .these points are categories according to shift vise operation or every week when the plant is in operating condition .

DO EVERY SHIFT 

1. Close ESV 15 mm by hand wheel by one and reopen back to full.

2. Check by draining oil from bottom of MOT for checking water / sediment in the oil.

3. Insure  that position of emergency governor knob sector (both emergency governor should be in service)
4. Check all vapor exhaust fans are in service
5. Check main oil tank level is normal
6. Dust off the turbine
7. Check the availability of H2O and Co2 bottles
8. Check the quality (moisture, acidity, chemical impurities) in turbines MOT (main oil Tank) once in a day.

9. Check the availability of Diesel generating set.
10. Check the availability of AC & DC lube oil pumps.

11. Check the actuator position it open/closed according to the steam demand or not .

DO EVERY WEEK

1. Take out oil tank filters one by one for routine check up and clean by blowing dry compressed air through them

2. Operate the standby equipments in rotation and no equipment should be kept idle for more than one week.

DO EVERY MONTHS

1. Check the operation of servomotor for forced closing non return valves by operating solenoids valves at reduced loads.

2. Check one by one the full closing of ESV after reducing load.

IMPORTANT DONTS FOR TURBINE OPERATION

1. Don’t start the turbine if the control signaling and protection system are not in working order.

2. During machine on barring gear if rotor eccentricity exceeds 0.07 mm do not roll the turbine.

3. Do not start the turbine with oil temperature at bearing inlet less than 40 degree Celsius.

4. Do not run the turbine on load with control valves servomotor in full open condition.

5. When the shut down carried out do not open the drains on steam admission pipes and cylinders till the metal temperature falls below 200 degree Celsius.

6. Do not allow the turbine to run in the steam less condition for more than 4 minutes.

7. Do not drain the oil, saturated with hydrogen into main oil tank

IMPORTANT DO’S FOR BOILER START UP OPERATION

1. Close start of vent valve main steam stop valve, soot blower line valve, CBD & Blow down valves and other vent valve.

2. Close deaerator and process steam immediately manually.

3. Crack open main steam line drain valve to keep a positive flow from the super heater.

4. Place the boiler immediately under manual control and reset all parameters as per manual operation.

5. Open all fans damper manually to maintain natural draft.

6. Remove ash from the combustion zone by manually scrapping.

7. Remove / clear ash from all ash hoppers manually

8. Close / shut off the fuel supply gates manually

9. Open air pre heater bypass fully manually if provided

10. Reset all electrical controls to stop position to avoid overloading of motors when re- starting.

11. LRSB lance should be outside from the boiler i.e in reset condition.

IMPORTANT DONT’S FOR BOILER START UP OPERATION

1. Do not open CBD and blow down valves

2. Do not open any drain valve except main steam line drain valve before MSSV (main steam stop valve)

3. Do not use steam supply from unit for process

4. Do not put any control in auto mode.

” TELL ME YOUR SUGGESTION INTO COMMENT BOX  WHICH POINTS SHOULD BE ADDED INTO THIS ARTICLE OR I AM NOT MENTIONED INTO THIS ARTICLE  . I AM VERY GRATEFUL TO YOU  “

 

IF YOU LIKE THIS POST ” IMPORTANT DO/DON’TS FOR TURBINE /BOILER OPERATION  PLEASE LIKE , SHARE AND YOU COMMENTS IS VERY VALUABLE SO PLEASE GIVE YOUR SUGGESTIONS IN COMMENT BOX please read once time if any mistake you find in this artical please suggest me through comment box or if  this website contains all original article which are written by me if any article on this site find copyrighted please inform me through at joginder005@gmail.com……..THANK’S

Facebook Comments
1 Comment

Leave a Reply

Your email address will not be published. Required fields are marked *

What Is Steam-Blowing Procedure In Thermal Power Plant
BOILER OPERATION
What Is Steam Blowing Procedure In Thermal Power Plant ?

Boiler Steam Blowing Procedure In Thermal Power Plant Steam blowing is an old method for physically removing any residue from the superheater and its connected pipelines. Typically, these materials consist of scales and loose minerals that may have become stuck along the production, storage, or installation processes. Principal Of Steam …

Ttop12-function-of-boiler-steam-drum-in-thermal-power-plant
BOILER OPERATION
1
TOP 12 BOILER STEAM DRUM FUNCTION IN POWER PLANT

TOP 12 BOILER STEAM DRUM FUNCTION IN POWER PLANT Hey, all my Askpowerplant readers; after a long time of absence, I am returning with a new topic today, which is related to boiler operation. These days, boiler operation has become a trending job. Hence, everyone wants to know how to …

working principal of benson boiler