Today we discussed about the emergency stoppage of steam turbine . at which conditions or emergency occurred during steam turbine operation we should immediately stop the turbine. after many research I discussed some point or we can say turbine emergency I found or faced and listening about them I discussed with you at below remembered these point may be changed according to turbine design and capacity :-

When the following occasions happened, the emergency stop shall be made:

(1) When T/G set emerges heavy vibration, or when any shaft vibration exceed 0.05mm:

(2) The turbine rotation speed increased to 3330r/min, and the emergency governor does not act accordingly, after tripping the speed does not decreased;

(3) When water impact emerges;

(4) When the turbine inside emerges metal impact sound, and continued to be expand or shaft seal get sparkles;

(5) When any shaft temperature exceed 105℃;

(6) When oil system gets on fire and can not stamp out quickly;

(7) The oil tank hydro-static level decreased to lowest point;

(8) The main oil pump failure or other fault, the lube-oil pressure decreased to 0.08Mpa and the meter can not control over it which continue to decrease;

(9) Shaft position move exceed rated data, however the protective device does not work;

(10) When rear cylinder membrane security valve works;

(11) Main steam pipe explode;

(12) When the following incident happens, the generator has to tripping from the system:

  1. Generator inside get smoke and fire;
  2. generator vibrate heavily;
  3. equipment accidentally failure and threatened the workers’ life.

IF YOU LIKE THIS POST “Situations in which need to urgently shut down of stem turbine ” PLEASE LIKE , SHARE AND YOU COMMENTS IS VERY VALUABLE SO PLEASE GIVE YOUR SUGGESTIONS IN COMMENT BOX please read once time if any mistake you find in this artical please suggest me through comment box or if  this website contains all original article which are written by me if any article on this site find copyrighted please inform me through at [email protected]……..THANK’S

Facebook Comments
2 Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

TOP 22 REASONS BEHIND TURBINE VIBRATION IN POWER PLANT
TURBINE OPERATION
TOP 22 REASONS BEHIND STEAM TURBINE VIBRATION IN POWER PLANT

Heiii power plant engineers how are you I hope all is well today we discussed a very important topic “TOP 22 REASON’S BEHIND STEAM TURBINE VIBRATION IN POWER PLANT “which is related to turbine operation. I suggest that every power plant engineers should know about this. In this topic, I …

Skid-pin System of the Steam Turbine
TURBINE OPERATION
Skid-pin System of the Steam Turbine

Heii power plant engineers how are you I hope all is well today we discussed about a very important topic related to a turbine or we can say a very important question which is generally asked by interviewer which is what is the skid –pin system in a steam turbine? …

Procedure for starting extraction steam through Woodward 505E Governor
TURBINE OPERATION
Procedure for starting extraction steam through Woodward 505E Governor

Procedure for starting extraction steam through Woodward 505E Governor Heii power plant engineer how are you? I hope you are good as usual today I am discussed a very important topic related to turbine operation which is Procedure for starting extraction steam through Woodward 505E Governor. before starting the topic …

Translate »